| $10,894,514 |
Rehab of SIRTOA Passenger Stations & Pedestrian Overpasses with E&H accessibility at the Great Kills Station, Staten Island
Contract No. A-80212
|
Excavation, Concrete, Piles & Masonry |
08/91 |
NYC Transit Authority
370 Jay Street
Brooklyn, NY 11201
|
Rehabilitation of seven (7) passenger stations including handicapped ramps, and construction of overpasses and platforms and all architectural finishes train service was in continuous operation. |
| $7,599,738 |
Ralph R. McKee Voc. & Tech H.S.
Staten Island, NY 10301
Contract #89C0753
|
Concrete Carpentry & Masonry |
10/91 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Complete modernization of 260,000 SF school where the school was occupied |
| $19,614,382 |
Baruch College
Site A Building Renovation, New York, NY
Contract DA #6500 1801 2119
|
Concrete, Demolition & Excavation |
|
City University of New York Dormitory Authority |
Renovation of 400,000 SF building constructed in 1898 including removal of all existing interior building systems, construction of two (2) new elevator shear walls, nine (9) new elevators, structural demolition, reconstruction and addition of two floors atop the existing structure. |
| $6,021,599 |
William H. Taft High School
Bronx, New York
Contract No. SCA90-0024C
|
Concrete & Carpentry |
11/92 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Modernization project includes new classroom interiors, and shops, laboratories, and expansion of the gymnasium, the library, and the outdoor field houses while the school was occupied. |
| $10,021,886 |
Bayside High School
Bayside, New York
Spec. 492-86
|
Concrete & Carpentry |
07/92 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Renovation and modernization of the entire school (277,000 SF) including new laboratories, shops, classrooms, offices, kitchen, cafeteria, auditorium, gymnasium, new boiler room, toilets, and elevator while the school was occupied. |
| $8,011,022 |
Christopher Columbus H.S.
Bronx, New York
Contract No. SCA90-00 26C
|
Concrete & Carpentry |
07/92 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Complete modernization (287,500 SF) and refinishing of classrooms, shops, laboratories, auditoriums, library, toilets and elevator while the school was occupied. |
| $28,169,761 |
East New York High School
Brooklyn, New York
Spec. SCA-90-0008C
|
Excavation, Concrete & Masonry |
1/93 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Construction of new rail car laboratory and modernization of existing facility (200,000 SF) including installation of a computer education network while the school was occupied. |
| $14,437,143 |
I.S. 246
Brooklyn, NY 11226
Contract No. C000006010
|
Excavation, Concrete & Masonry |
09/94 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
New 44,000 SF addition to the existing school building and new handicap accessibility, new kitchen, elevators, cafeteria, computer and laboratory rooms, and state-of-the-art building automation system while the existing school was occupied. |
| $3,541,520 |
Brooklyn Navy Yard
Building 294 A
Asbestos Abatement/Selected Demolition
|
Demolition |
09/94 |
Brooklyn Navy Yard Development Corporation
Brooklyn , NY 11205
|
Removal of structural deficient building components, return of structural integrity to the facility and remove and decontaminate and dispose of ACM. |
| $22,054,245 |
P.S. 244
Brooklyn, NY
Contract No. C000006756
|
Foundations & Retaining walls |
10/97 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
New 42,000 SF addition to increase student capacity by 600 and upgrade of existing 74,000 SF building with new kitchen and cafeteria and conversion of existing cafeteria to community space while the existing school was occupied. |
| $38,396,064 |
Cooperative Technical Education HS
New York, NY
Contract No. C000006737
|
Demolition, Concrete, Steel Erection, Masonry, Carpentry, Elevators |
10/97 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Complete renovation and modernization of existing 98,000 SF vocational educational facility including shops for five (5) new vocational programs and increase student capacity to 680 student while the school was occupied. |
| $23,224,681 |
P.S. 130
New York, NY
Contract No. C000006188
|
Foundations & Underpinning |
05/97 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Construction of new five (5) story addition including new gymnasium, kitchen, and cafeteria and modernization of 730,000 SF existing building and replacement of all new systems while the existing school was occupied. |
| $38,242,586 |
Walton HS
Bronx, New York
Contract No. C000006380
|
Excavation, Demolition Concrete, Carpentry & Masonry |
05/97 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Renovation of 266,000 SF school for 3,000 students including reconstruction of ninety (90) new program spaces while the school was occupied. |
| $26,950,479 |
P.S. 16
Queens, NY
Contract No. C000007317
|
Excavation, Demolition Concrete, Carpentry & Masonry |
9/98 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Modernization of a primary school (91,000 SF) increasing student capacity from 363 to 1,110 students including conversion of the basement area into a full serving kitchen and student cafeteria. The project was completed in thirteen (13) months. |
| $4,348,000 |
P.S. 230
Brooklyn, NY
Contact No. C000008117
|
Carpentry |
10/2000 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
New addition consisting of 12 rooms (6 classrooms, student's bathrooms & staff's room). Electrical upgrade to existing building including PA system, FA system, emergency lighting and intrusion alarm. |
| $10,680,000 |
Glen Oaks Campus
Queens, NY
Contract No. C000008540
|
|
05/2001 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Asbestos abatement / Demolition of 2 buildings and site work |
| $33,750,000 |
I.S.77
976 Seneca Ave.
Queens, NY
Contract No. C000008637
|
Excavation, Demolition Concrete, Carpentry & Masonry |
06/2003 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Design and construction of the addition building of 55,694 square feet , 5 stories (1 below ground) with a capacity for 540 students and connecting corridors from 2nd through 5th floor of the existing building. Demolition of first floor. |
| $19,772,000 |
P.S. 108
108-10 109th Ave.
South Ozone Park, NY
Contract No. C000008527
|
Excavation, Demolition Concrete, Carpentry & Masonry |
07/2002 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Design and construction of the addition building to a existing primary school. The building will be a five-story structure with cellar and mechanical penthouse and have an approx total gross area of of 45,528 SF, |
| $50,880,000 |
P.S. 66
850 Rockaway Pkwy
Brooklyn, NY
Contract No. C000008698
|
Excavation, Demolition Concrete, Carpentry & Masonry |
08/2003 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Design and construction of a new primary school for approx 904 students. The building will be a two-story structure with a three-story wing, partial cellar and mechanical penthouse and have an approx total gross area of 111,402 S.F. The site includes one large playground and one early childhood playground. |
| $42,840,000 |
P.S. 270
234 Street & Merrick Blvd.
Laurelton, NY
Contract No. C000008745
|
Excavation, Demolition Concrete, Carpentry & Masonry |
08/2003 |
NYC School Construction Authority
30-30 Thomson Avenue
Long Island City, NY 11101
|
Design and construction of a primary school for approx 704 students. The building will be a four-story structure with a full cellar and mechanical penthouse and have an approx total gross area of 95,500 sf. The site includes one large playground and one early childhood playground. |