|
|
P.S. 270. .Contract No. C000008745. .234 Street & Merrick Blvd. Laurelton, NY.
Design and construction of a primary school for approx 704 students. The building will be a four-story structure with a full cellar and mechanical pen. . .
|
|
|
|
|
|
|
|
|
BROOKLYN COLLEGE NEW WEST QUAD BUILDING
|
$58,439,000.00

|
In Progress
|
Dormitory Authority of the State of New York 515 Broadway Albany, New York 12207-2964
|
A new 140,000-sq.-ft. West Quad Building will include classroom space and house admissions, recruitment, financial aid, food services and grounds and custodial support offices. It will also be home to the Department of Physical Education & Exercise Science and feature improved indoor sports facilities including several new gymnasiums, a swimming pool and an indoor track.
|
|
PS 237K
|
$56,587,000.00

|
In Progress
|
NYC School Construction Authority 30-30 Thomson Avenue Long Island City, NY 11101
|
P.S. 237 is a 22,000,00 square foot 4 story brick building. It was built in response to a pressing need for more schools in Brooklyn . The building's exterior brick facade design was designed to blend well with the surrounding neighborhood , while the school's interiors emphasizes educational technology by featuring computers , televisions and telephones in all classrooms. P.S. 237 will provide a safe and secure environment conductive to the exploration of each individual's potential.
|
|
PS 128 QUEENS
|
$49,450,000

|
In-progress
|
|
PS/IS 128Q is a design/build project. The new school, for 650 students, will be built on the play yard area of the existing PS 128Q school. When the new building is complete, the existing one-story building will be demolished to accommodate the play yard for the new school. The new building, of approximately 93,000 sq. ft., will include a basement and four stories above grade. It will be fully air-conditioned, and will include wireless LAN and Internet access throughout.
|
|
BRONX STUDIO SCHOOL FOR ARTISTS AND WRITERS
|
$46,382,000

|
In Progress
|
|
BSSWA, a project conceived by the SCA designed by Hillier Architecture and executed by AMCC Corp consist of the demolition of existing 3 story high school with cellar and the construction of a brand new 6 story modern facility with cellar and public assembly space with 5 floors and cellar occupied by Board of Education's Bronx Studio School for Writer and Artist and the 6th floor be occupied by the prestigious Casita Maria Organization of the Bronx. When completed to be an inspiration as well as a welcome addition to the Hunts Point Area of the South Bronx.
|
|
PS 89 BROOKLYN
|
$33,870,000

|
In-progress
|
|
PS/IS 89 will be a 333-seat school. The building, with a gross area of approximately 55,900 sq. ft., will include a basement and four stores above grade. The project, designed by the Pratt Planning and Architectural Collaborative, includes the partial demolition, connection and conversion of about 45,000 sq. ft. of several existing buildings, and about 10,000 sq. ft. of new construction. The school building will be fully air-conditioned, and will include wireless LAN and Internet access throughout.
|
|
PS 829R
|
$22,148,000.00

|
In Progress
|
NYC School Construction Authority 30-30 Thomson Avenue Long Island City, NY 11101
|
Addition to & Rehabilitation of Existing School.
|
|
PS 245Q
|
$19,187,000.00

|
In Progress
|
NYC School Construction Authority 30-30 Thomson Avenue Long Island City, NY 11101
|
Fully air conditioned, handicapped accessible 3-story school with a gross area of 47,000 sq. ft. for students in pre-kindergarten through 3rd grade. Features include standard and special education classrooms, library, cafeteria, multi-purpose recreation room and a medical suite. There is a 5000 sq. ft. schoolyard which includes an early childhood playground.
|
|
PS 229/230 X
|
$9,268,000

|
In-Progress
|
|
PS 229/230 X is a 5- story primary, elementary, and middle school located in the Bronx. The project involves the structural rehabilitation of the school through the reinforcement of existing concrete columns and girders, and the erection of steel frames which will support new masonry shear walls.
|
|
PS 48
|

|
In-progress
|
NYC School Construction Authority 30-30 Thomson Avenue Long Island City, NY 11101
|
P.S. 48 (Queens) is a design/build project. The new school building for 611 students from Pre-K to 8th grade will be 93,000 sq.ft., five-stories tall. It will include 23 typical classrooms, 2 resource rooms, PS and IS science classrooms with prep room, a music classroom, an art classroom, a 5,400 sq.ft. gym, and 300-seat auditorium, cafeteria and kitchen as well as administrative offices and other support spaces.
|
|
|
|
|
|
|
|